There is good summary on page itself but some points still.

On PS4 Orbital platform

  • It'll have 100W of power and long duration orbital life.
  • Spin-stabilization is being rejected and a separate RCS module would be implemented as PS4's native RCS is not suitable for long duration operation.

    On human spaceflight

  • Multiple air-drop tests planned to examine parachute performance. One is planned before 2019 end.
  • Multiple inflight abort tests (starting mid 2020) to verify crew escape system in various stages of flight.
  • December 2020 is being aimed for first Gaganyaan (uncrewed) flight.
  • Crew of four crew will be chosen (1 backup) selection process still underway (contradicting media reports).
  • No separate official term for Indian astronauts yet.

    On SSLV

  • First 2 launches under ISRO later NSIL will undertake its operations. First launch 2019 end or start of next year.
  • Mobile launcher can be considered, sea launch not being considered due to large costs involved.
  • SSLV stages road transportable but currently will only launch from SHAR.
  • Not committing to new launch site at Kulasekarapattinam despite media reports suggesting otherwise.

    On Venus orbiter mission (Shukrayaan).

  • Aiming at 2023 launch.
  • Payload development and design under progress.
  • Mass of spacecraft has been finalized (no number given)

    Aditya-L1

  • In final stage of development and targeting second half of 2020 launch.

    MOM-2

  • Still in early Mission Definition Phase!
  • No target dates yet. Even though in parliament they have said 2024.
  • Lander or surface probe is still being considered.

    Chandrayaan-3

  • No announcement yet.

    Chandrayaan-2

  • Fairly good idea on "Hard Landing".
  • Apparently nothing major was wrong and can fly again on same configuration.
  • Failure Analysis Committee report should be released soon.

    On RLV LEX (Landing experiment)

  • Will perform Autonomous landing after being airdropped from helicopter at airstrip in Chitradurga, Challakere.
  • Aiming to execute by December 2019.

    On Semi cryogenic (Kerolox) SCE-2000 engine.

  • Implementation of new stage with SCE-200 engine after 2022.
  • Would only implement new stage to GSLV Mk III after Gaganyaan project as it is being human rated.